So we took two of the bags of small concrete pieces and emptied them into the ditch.......and spread out the pieces to make sure the ditch was 3" deep all the way across and to level it all out. We decided to go with the ditch being 3" deep because we calculated the space and figured out that if it was 3" deep we'd only need to buy one cubic yard of concrete from a local landscaping place call Larm's
And yesterday when I got home Chris had laid down the rebar
We'll have to carefully schedule a time to do the concrete pour as I'm only on day 9 of 17 days with no day off.
4.20.2010
Prepping for Concrete
After we broke up the concrete and hauled it away, it was time to prep the area for the future concrete pour

After clearing out the concrete there was a significant height difference in the dirt across the ditch. We wanted it to be about 3" deep all the way across for the concrete to fill in, and we clearly weren't there yet
(that's a big gap)