Well, this was done 2 weeks ago, so it’s about time I finally get to it, right?
We knew when we got the house that we were at least going to have to replace ONE of the sewer laterals. There is a new rule in (at least) Oakland where upon sale of a home you need to have the sewer lateral tested to see if it has to be replaced. That’s $800. And you have to do it. Or else you leave thousands of dollars (in our case $4500) in an escrow account. If the test fails, you need to replace it (normally nowadays a seller will already have had it done, but it wasn’t for us because it was a distressed sale). If you replace it 99% of the time the company will credit that $800 test fee to the replacement cost. If it passes the test, woo-hoo, you just blew $800 for like an hour of someone else’s work. It’s annoying.
We had an estimate done when we were in contract and knew there were 2 sewer laterals for our house – a little out of the ordinary. We knew that at least one needed to be replaced, and they would test to see if the other one needed to as well.
When they came two Mondays ago they said it was supposed to take 2 1/2 days, but they were pretty sure it would only take 2. Famous last words.
They started digging on the kitchen side of the house – where they knew it needed to be replaced based on the estimate they had already done (they could tell with their camera that there were breaks in the pipe). They began digging at the clean out, and also where our pipe connects with the city – we are responsible for everything between the house and where it connects to the city, and the city is responsible past that.
The clean out was pretty easy and went without too much trouble because it was only about 2 feet down. But man I felt bad: the connection with the city was 9 1/2 feet down! The spent the entire first day laying things out and digging the clean out hole and this hole

The next day they came out ready for more digging. They first dug out the THIRD hole on the bathroom side of the house (where we only knew it needed to be tested)

Easy, only 1-2 feet down.
But then they went back to the giant hole and worked and worked and worked

I felt bad for them. Digging fucking sucks. And it was hot. It’s their job, and they’re good at this, but that doesn’t mean getting sweaty, dirty, and TIRED digging for 5-7 hours isn’t hard ass fucking work. By late afternoon this is what I saw out the backyard

If you look hard, you’ll see one guy standing up, and the other laying down – with his head in his hands. In defeat. Why defeat? Welp, they dug in the wrong place. And he was EXHAUSTED. He was normally super friendly and nice, but when I went out there to see how things were doing, he couldn’t even look at me. They needed to dig 2 feet over. And 8 1/2 feet down. That fucking SUCKS. And they all knew it

There’s pretty much nothing else to say except that was a really shitty discovery. When their boss came by the morning before and told them where to dig, he was just slightly off. And they had to dig again. I felt so fucking bad for them. Chris gave them a tip at the end of the day because you could tell they were so tired and they basically had to start brand new the next day

So they came back out on Wednesday, and finished the SECOND hole. This time only 8+ feet down. Instead of 9 1/2. Oy

But the good news is that they got all the digging and the replacement done on Wednesday. Hooray! THEN they had to finally move on to the third hole on Friday (Thursday at another job) that they had dug up earlier

Luckily when they did the pressure test there were no leaks in the main pipe, hooray! We did find out with flushing of toilets and showers that there were breaks in the connections right here (above photo) so they replaced those for us so we didn’t have any sewer water leaching into the soil, yay! Once they were all done, they filled in all the giant holes and replaced our clean outs


All in all it took them 4 days (instead of the 2 1/2 they budgeted for) and came in with a price tag of about $7500 – I was afraid both sewer laterals needed to be replaced, so it was less than I was preparing myself for. Hooray! And the good news is that we submitted our paperwork to EBMUD, so hopefully that means we get our $4500 back out of the escrow account soon that they held as a “deposit” to get this work done. All these stupid rules… but, at least we’ve got an item checked off our 2016 to do list, and for a couple thousand bucks less than we were bracing for. Progress!